Ground was broken for the Education Center in the Spring of 2008 and the Education Center will open in the fall/winter. Watch for news of the Grand Opening in the Spring of 2009.
The outside is finished
Inside - Lower Level
Inside - Upper Level
Installing the siding
Roof is Shingled
Inner siding
Stairs
Ductwork & Piping